• NRC: Millstone Power Station, Unit 2

    Home > Facility Locator > Operating Nuclear Power Reactors by Location or Name > Millstone Power Station, Unit 2 Millstone Power Station, Unit 2 Location:

  • Millstone Units 1, 2 & 3, Modification to Technical

    U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos. 1, 2 and 3 Modification to Technical Specification Change Request Administrative and Editorial Changes to the Unit Nos. 1, 2 and 3 Technical Specifications By letter dated November 8, 2001,(1) Dominion Nuclear Connecticut, Inc. (DNC), proposed

  • Millstone, Unit 3 Nuclear Regulatory Commission

    Millstone Power Station Rope Ferry Road, Waterford, CT 06385 'JUL 13 2007 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No. NSSL/RWM Docket No. License No. 07-0397 RO 50-423 NPF-49 DOMINION NUCLEAR CONNECTICUT, INC. MILLSTONE POWER STATION UNIT 3

  • NRC Failure to Adequately Regulate Millstone Unit 1

    U.S. Nuclear Regulatory Commission (NRC) knowingly allowed NU to operate the Millstone Unit 1 Nuclear Power Station for 20 years in violation of its operating license and beyond its design basis. In the 10 CFR 2.206 petition, Galatis and We the People related that during normal refueling outages at Millstone Unit 1, NU offloaded the full core

  • Millstone Nuclear Power Plant Wikipedia

    The Millstone Nuclear Power Station is a nuclear power plant in Connecticut and the only multi unit nuclear plant in New England.It is located at a former quarry (from which it takes its name) in Waterford.With a total capacity of over 2 GW, the station produces

  • Location: Waterford, New London County, Connecticut
  • NRC: Millstone Unit 1

    2018-07-25· Owner responsibility for the Millstone site was transferred from Northeast Utilities to Dominion Nuclear Connecticut on March 31, 2001. Safety related structures, systems, and components (SSCs) and SSCs important to safety remaining at Millstone Unit 1 are associated with the spent fuel pool island where the Millstone Unit 1 spent fuel is

  • millstone unit 2 bbatouchofrome

    JUL 2 2001 US NRC ADAMS Common Web Interface. Millstone Nuclear Power Station, Unit Nos. 2 and 3 10 CFR 50.59 and Commitment Change Report for 2000 Pursuant to the provisions of 10 CFR 50.59(d)(2), the reports for Millstone Nuclear Power Station, Unit Nos. 2 and 3, are submitted in Enclosures 1 and 2 for changes. Click for details√

  • Millstone Units 1, 2 & 3 Changes to Addressee nrc.gov

    U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit Nos. 1, 2 and 3 Changes to Addressee and Distribution Lists for Correspondence from the NRC The purpose of this letter is to provide the Nuclear Regulatory Commission (NRC) with

  • Millstone, Unit 1 Issuance of Final Report Pertaining to

    Millstone Power Station Rope Ferry Road Waterfordc, CT 06385 OCT 5 2001 Docket No. 50-245 B 18496 RE: 10 CFR 70 Director Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission Washington, DC 20555 Millstone Power Station, Unit No. 1 Issuance of Final Report Pertainincq to Unaccounted for Spent Fuel Rods

  • EA-02-014, Millstone, Unit 1, Notice of Violation and

    $288,000 (NRC Special Inspection Report No. 50-245/01-013) Dear Mr. Price: This letter refers to the NRC special team inspection conducted at the Millstone Power Station, Unit 1, between October 9 18, 2001, and continued in the NRC Region I office until December 21, 2001, to review the results of your investigation of the loss of two

  • millstone unit 2 bbatouchofrome

    JUL 2 2001 US NRC ADAMS Common Web Interface. Millstone Nuclear Power Station, Unit Nos. 2 and 3 10 CFR 50.59 and Commitment Change Report for 2000 Pursuant to the provisions of 10 CFR 50.59(d)(2), the reports for Millstone Nuclear Power Station, Unit Nos. 2 and 3, are submitted in Enclosures 1 and 2 for changes. Click for details√

  • NRC Renews Operating Licenses for Dominion's Millstone

    LCG, November 29, 2005--The Nuclear Regulatory Commission (NRC) renewed the operating licenses for Dominion's Units 2 and 3 at the Millstone Power Station in Connecticut. The renewal adds 20 years to the operating licenses, extending the lives of Units 2 and 3 to July 31, 2035, and November 25, 2045, respectively. Unit 1, which, commenced

  • NRC increases oversight at Millstone nuclear Unit 3

    The U.S. Nuclear Regulatory Commission (NRC) increased its level of oversight at the Millstone Unit 3 nuclear plant in Connecticut after the commission finalized a “white,” or low to moderate

  • 140542 Nuclear Regulatory Commission

    north anna power station units i and 2 surry power station units 1 and 2 millstone power station units 2 and 3 kewaunee power station response to nrc bulletin 2012-01 -design vulnerability in electric power system on july 27, 2012, the nrc issued nrc bulletin 2012-01, "design vulnerability in

  • NRC Begins Inspection at Millstone Nuclear Power Unit

    The U.S. Nuclear Regulatory Commission (NRC) started special inspection at the Millstone Unit 2 nuclear power plant in Connecticut. The two-member inspection team arrived at the plant to begin the

  • Millstone Nuclear Power Plant ~ Nuclear Power Plants

    2011-03-10· The Millstone Nuclear Power Plant is the only nuclear power generation site in Connecticut. It is located at a former quarry (from which it takes its name) in Waterford. Of the three reactors built here, units two and three are still operating at a combined output rating of 2020 MWe.. The Millstone Nuclear Power Plant covers about 500 acres (2 km²). The power generation complex was

  • UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I

    Millstone Power Station . 5000 Dominion Boulevard . Glen Allen, VA 23060-6711 . SUBJECT: MILLSTONE POWER STATION UNIT 3 NRC SPECIAL INSPECTION REPORT 05000423/2014013 . Dear Mr. Heacock: On December 9, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a special inspection at your Millstone Power Station, Unit 3, in response to

  • JUL 2 2001 Nuclear Regulatory Commission

    JUL 2 2001 Docket Nos. 50-336 50-423 B 18442 RE: 10 CFR 50.59 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Nuclear Power Station, Unit Nos. 2 and 3 10 CFR 50.59 and Commitment Change Report for 2000 Pursuant to the provisions of 10 CFR 50.59(d)(2), the reports for Millstone Nuclear Power Station, Unit Nos. 2 and 3,

  • Dominion Nuclear Regulatory Commission

    NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION (02-2014) LICENSEE EVENT REPORT (LER) CONTINUATION SHEET 1. FACILITY NAME 2. DOCKET 6. LER NUMBER 3. PAGE I00YEAR YEAR I SEQUENTIAL REV NUMBER NO. Millstone Power Station Unit 2 05000336 3 OF 7 2014 -006 00 NARRATIVE These circuits connect the station to the 345 kV system transmission grid and

  • George Galatis Wikipedia

    George Galatis was a senior nuclear engineer and whistleblower who reported safety problems at the Millstone 1 Nuclear Power Plant, relating to reactor refueling procedures, in 1996. The unsafe procedures meant that spent fuel rod pools at Unit 1 had the potential to boil, possibly releasing radioactive steam throughout the plant.

  • Is Safety at Millstone Getting Enough Attention? Health

    2017-08-15· Millstone is responsible for about $1.6 billion in economic impact in Connecticut each year, according to a 2016 analysis by Chmura, a consultant contracted by Dominion. The facility employs about 1,100 full-time workers and 400 full-time contractors, Holt says. It has two operating nuclear reactors, Units 2 and 3. During month-long refueling

  • Nuclear Energy, Power Plant, and Reactor Sourcebook: 1990s

    Nuclear Energy, Power Plant, and Reactor Sourcebook: 1990s Controversy About Refueling at Millstone Plant and Alleged Discrimination Against Engineers for Raising Concerns about Spent Fuel Cooling eBook: U.S. Government, Nuclear Regulatory Commission (NRC): Amazon.ca: Kindle Store

  • Author: U.S. Government, Commission (NRC), Nuclear Regulatory
  • NRC starts special inspection at unit 3 of Millstone

    We have recently upgraded our technology platform. Due to this change if you are seeing this message for the first time please make sure you reset your password using

  • Industry Shaping Event 1996 Millstone Loss of

    All Three Millstone Units Were Shutdown Due to Loss of CM. Unit 1 November 1995 (never restarted) Unit 2 February 1996 to March 1999. Unit 3 March 1996 to July 1998. NRC Watch List in January 1996. NRC approval to restart was required

  • Dominion Nuclear Regulatory Commission

    NRC FORM 366A U.S. NUCLEAR REGULATORY COMMISSION (02-2014) LICENSEE EVENT REPORT (LER) CONTINUATION SHEET 1. FACILITY NAME 2. DOCKET 6. LER NUMBER 3. PAGE I00YEAR YEAR I SEQUENTIAL REV NUMBER NO. Millstone Power Station Unit 2 05000336 3 OF 7 2014 -006 00 NARRATIVE These circuits connect the station to the 345 kV system transmission grid and

  • Millstone Landing South in Vero Beach, FL Prices, Plans

    Millstone Landing South is a new townhouse and single family home development by D.R. Horton in Vero Beach, FL. Explore prices, floor plans, photos and details. Now Selling from $222,990.

  • UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I

    Millstone Power Station . 5000 Dominion Boulevard . Glen Allen, VA 23060-6711 . SUBJECT: MILLSTONE POWER STATION UNIT 3 NRC SPECIAL INSPECTION REPORT 05000423/2014013 . Dear Mr. Heacock: On December 9, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a special inspection at your Millstone Power Station, Unit 3, in response to

  • NRC extends Millstone licence Nuclear Engineering

    The US Nuclear Regulatory Commission (NRC) has renewed the operating licence of units 2 and 3 of Dominion’s Millstone power station for an additional 20 years. The plant, located about 5km southwest of New London, Connecticut will see unit 2 operating until 31 July 2035, and unit 3 extended to 25

  • NRC issues corrective actions against Millstone 2 nuclear unit

    Dominion (NYSE: D) is implementing a range of corrective actions at the Millstone Unit 2 nuclear plant in Connecticut to address violations. In September 2011, the NRC became aware that Dominion

  • NRC to Meet With Connecticut Nuclear Energy Advisory

    NRC's oversight. Both Millstone units operated safely during 2018. At the end of the year, all inspection findings and performance indicators were of very low safety significance (green). As a result, both units remain under the NRC's normal level of oversight, which